Results:
Tag: Savannah District
Clear
  • On groundhogs and water levels: What will reservoirs look like on Memorial Day?

    SAVANNAH, Ga. -- February has arrived and Groundhog Day has come-and-gone. So this makes me a little late in giving my annual prediction on how the three Corps of Engineers’ Savannah River reservoirs will begin the 2015 tourist season.
  • Recovery of CSS Georgia remains in progress after 150 years in Savannah River

    Recovering the CSS Georgia ironclad scuttled on the Savannah River floor marks the beginning of the construction phase of the Savannah Harbor Expansion Project.
  • SHEP and the Savannah River – a Wrap-up

    Environmental stewardship remains a top focus of the Savannah Harbor Expansion Project. Deepening the Savannah harbor will impact the ecosystem of the estuary and conditions in the river all the way to the base of the Thurmond Dam north of Augusta, Georgia.
  • Clock winds down as elite engineering team readies for deployment

    SAVANNAH, Ga. – As 2014 departs, so will 12 members of the 542nd Forward Engineering Support Team – Advanced (FEST-A), who deploy to Kuwait in January for more than six months to provide specialized technical engineering support for the Central Command area of responsibility.
  • Private reservoirs support Corps public ones

    Editor’s note: This installment of a continuing series of articles explaining the operations of the Savannah River basin, looks at the support upstream, privately-owned reservoirs contribute to keeping the basin in balance. Savannah District officials often get asked why Lake Keowee, owned by Duke Energy, seems to remain full while the Corps’ reservoirs, particularly Hartwell Lake seems to drop. Read below on how the far-upper basin supports the central basin.
  • Corps sponsors wetlands tour for Coastal Georgia home-schoolers

    RICHMOND HILL, Ga. – Discovering frontiers outside of the classroom – or the home – can reconcile traditional learning methods and enrich the educational experience for students inundated with an array of new concepts.
  • Updates on the Savannah River Basin Comprehensive and Flood Storage studies

    In October 2013 we announced an initiative to assess our flood storage capacity to test the possibility of reducing our current flood storage allotment. More specifically, the study will provide information that will better define the present need for flood storage in the basin. In the announcement we estimated the study would take approximately 12 months. Based on recent updates from the Hydrologic Engineering Center (HEC), the organization conducting most of the study, the results will be delayed about six more months.
  • New Fort Benning hospital set to open for business

    FORT BENNING, Ga. – Hundreds gathered for the ribbon-cutting ceremony held Nov. 7 in the atrium of the newly-constructed Martin Army Community Hospital at Fort Benning, Georgia.
  • Commander: An open letter on Savannah River Basin drought management

    Since entering drought level 1 some stakeholders in the upper basin have written urging Savannah District leaders should take immediate and dramatic actions to preserve reservoir levels. Col. Thomas Tickner, the District Commander addresses these emails in this open-letter posting.
  • Freshwater storage impoundment mitigates increased chlorides in Abercorn Creek

    SAVANNAH, Ga. – Understanding the reverberating environmental impacts of the Savannah Harbor Expansion Project has been a sizable undertaking for the Corps’ and its partners. Preserving high water quality standards is at the forefront of the Corps’ efforts to minimize adverse environmental effects that may result from the expansive project.