Results:
Tag: Mississippi River
Clear
  • Upper Mississippi River 2020 navigation season comes to an end

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, locked its last tow of the season today, Nov. 30, to end the navigation season on the Upper Mississippi River.
  • Public walkway at Locks and Dam 14 to close for construction

    Starting Dec. 1, the U.S. Army Corps of Engineers Rock Island District will close the walkway located along the riverfront at Locks and Dam 14 in Pleasant Valley, Iowa, for construction until Nov. 21, 2021. The extended closure is necessary for demolition of the existing structure and construction of a new, concrete walkway.
  • Corps seeks input on Mississippi River island project near Hastings, Minnesota

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, will host a virtual public meeting Wed., Nov. 4, from 1-2 p.m., to introduce an island-building project the agency is proposing for the Mississippi River in Hastings, Minnesota.
  • Minneapolis locks closing for the end of navigation season

    ST. PAUL, Minn. – Due to the arrival of winter, the U.S. Army Corps of Engineers, St. Paul District, is closing its Lower St. Anthony Falls lock and Lock and Dam 1 to commercial and recreational vessels for the end of the navigation season on Saturday Nov. 7.
  • Corps seeks input on Mississippi River island project near Hastings, Minnesota

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, is seeking public input on its draft Environmental Assessment, or EA, for a proposed island project near Hastings, Minnesota.
  • Mississippi River mainline levees Draft Supplemental Environmental Impact Statement virtual public meetings scheduled

    The U.S. Army Corps of Engineers scheduled two virtual public meetings, Sept. 30 and Oct. 1, for its Draft Supplement II (Draft SEIS II) to the 1976 Final Environmental Impact Statement (FEIS), Mississippi River and Tributaries (MR&T) Project, Mississippi River Mainline Levees (MRL). Comments will be accepted through Oct. 13, 2020.
  • USACE releases Mississippi River mainline levees Draft Supplemental Environmental Impact Statement

    The U.S. Army Corps of Engineers (USACE) released its Draft Supplement II (Draft SEIS II) to the 1976 Final Environmental Impact Statement (FEIS), Mississippi River and Tributaries (MR&T) Project, Mississippi River Mainline Levees (MRL), Aug. 28. USACE will accept written comments through Oct. 13, 2020.
  • Mississippi River Commission cancels Morgan City public hearing

    The Mississippi River Commission has canceled the Morgan City, Louisiana, public hearing scheduled for Aug. 28, 2020, during the annual low water inspection trip due to Hurricane Laura. Safety is paramount during any severe weather event.  Because of the uncertainty of the hurricane, the commission has decided to cancel this stop.
  • PUBLICATION NOTICE: Three Rivers, Southeast Arkansas Navigation Study: Ship Simulation Report

    Abstract: The McClellan-Kerr Arkansas River System (MKARNS) is a major inland waterway that begins at the Port of Catoosa in Tulsa, OK, and travels to the confluence of the White and Mississippi Rivers. Over the years, many structures have been built to help control overland flow between the White, Arkansas, and Mississippi Rivers. These structures have required a significant amount of rehabilitation, which has resulted in high maintenance costs. The US Army Corps of Engineers and the Arkansas Waterways Commission conducted the Three Rivers Southeast Arkansas Feasibility Study (also known as the Three Rivers Study). The Three Rivers Study focused on providing long-term dependable navigation in the MKARNS. From this study, a proposal was developed that included a 1,000 ft reopening of the Historic Cutoff and a reinforcement of several areas near the White River. In 2019, the US Army Engineer Research and Development Center Ship/Tow Simulator was used to perform a navigation study to ensure the proposed modifications did not negatively impact navigation on the White River section of the MKARNS. Assessment of the proposed modifications was accomplished through analysis of ship simulations completed by experienced pilots, discussions, track plots, run sheets, and final pilot surveys.
  • Contract awarded for Carrollton Floodwall Project

    The U.S. Army Corps of Engineers, New Orleans District, recently awarded a contract for the Mississippi River Carrollton Floodwall project in New Orleans. The $8.9M construction contract was awarded to APC Construction, LLC of Algiers, La. Construction is expected to begin in late September and be completed by March 2022.