Results:
Tag: USACE
Clear
  • ERCIP aims to improve energy resilience, security and conservation for military projects

    The Energy Resilience Conservation Investment Program is a critical part of the Department of Defense Military Construction program that aims to improve energy resilience, energy security and energy conservation of its existing missions.
  • Soo Locks Visitor Center opens for 2022 season

    SAULT STE. MARIE, Mich., – The U.S. Army Corps of Engineers is opening the Soo Locks Visitor Center in Canal Park at 10 a.m. May 8. Visitor Center hours for the month of May are 10 a.m. to 6 p.m., closed on Wednesdays and Thursdays. Visitor Center hours and days for June will be re-evaluated and announced prior to Memorial Day. “We are excited to open the Visitor Center after a long winter,” Chief Park Ranger Michelle Briggs said. “This year, in addition to updated exhibits, we have a new water safety program with goody bags we hope all will enjoy.”
  • Corps completes Cumberland Gap Flood Plain Management Services Study

    NASHVILLE, Tenn. (April 29, 2022) – The U.S. Army Corps of Engineers Nashville District recently completed a Flood Plain Management Services Special Study of the Gap Creek Watershed for the city of Cumberland Gap, Tennessee.
  • Army Corps of Engineers reminds visitors to practice water safety

    As millions of Americans plan visits to our nation’s lakes and rivers, the U.S. Army Corps of Engineers, Rock Island District reminds visitors of the importance of practicing safe, sensible, and thoughtful activities in, on, and around open water.
  • Transatlantic Expeditionary District Relinquishment of Command

    The U.S. Army Corps of Engineers Transatlantic Division’s Expeditionary District commander, Col. Kenneth N. Reed, transferred command to Lt. Col Peter M. Ammerman at a relinquishment of command ceremony, April 25, 2022, at Camp Arifjan, Kuwait.
  • Final structural component of the Canandaigua VA Medical Center Phase 2 Project placed

    The construction of the Canandaigua VA Medical Center Phase 2 project reached another major milestone today when the final structural beam was placed atop the Community Center Building (Bldg. #62) by the project team. Phase 2 of the project was awarded for $176.2 million to Pike Co. and Hueber-Breuer Construction Joint Venture and includes demolition of Buildings #33 and #34 to support construction of a 96 bed Community Living Center complex, Community Center Building and Building N Loading Dock, in addition to renovations to Building #3 and #9 to support the Phase 1 Outpatient Clinic.
  • NR 22-11: Cheatham Lock undergoing series of navigation closures

    ASHLAND CITY, Tenn. (April 28, 2022) – The U.S. Army Corps of Engineers Nashville District announces that Cheatham Lock at Cumberland River mile 148.6 is undergoing a series of closures from May 16 through Aug. 5.
  • USACE further reduces flows from Lake Okeechobee to the Caloosahatchee

    The U.S. Army Corps of Engineers (USACE) Jacksonville District will further reduce releases from Lake Okeechobee to the Caloosahatchee beginning Saturday, April 30 as we continue a gradual step-down to help moderate the high recession rate on Lake Okeechobee while sustaining beneficial conditions for the lake and estuaries through the remainder of the dry season.
  • USACE FUSRAP Team Completes First Seaway Site Five-Year Review of Selected Remedy

    The U.S. Army Corps of Engineers, Buffalo District completed performing the first five-year review of the protectiveness of the selected remedy outlined in the 2009 record of decision for the Seaway Formerly Utilized Sites Remedial Action Program (FUSRAP) Site, located within the 100-acre Seaway Industrial Park along River Road in the Town of Tonawanda, New York. The selected remedy, Containment with Limited Off-site Disposal, requires the capping of Seaway Areas A, B, and C within the landfill boundaries. The cap for the FUSRAP-related material (soil contaminated with radium, thorium, uranium, and uranium daughter products) will be constructed of multiple layers of various types of soil, fabric, and geomembranes at least 4.5-feet thick. Long-term monitoring of FUSRAP-related materials in capped areas, surveillance, and maintenance will be performed by the federal government. The federal government will ensure that land-use controls are in place to prevent future access to and disturbance of the contained FUSRAP-related materials.
  • Temporary lane closure of HWY 165/265 across Table Rock Dam

    One lane of Highway 165/265 across Table Rock Dam is scheduled to be closed from 7 a.m. until 5 p.m. May 2-4 so work crews can make repairs to hatch covers along the downstream lane. Closure dates and times are weather contingent, and alternate closures will be provided if necessary.