Results:
Tag: J. Percy Priest Dam
Clear
  • First responders work through security scenario at J. Percy Priest Dam

    NASHVILLE, Tenn. (April 5, 2019) – First responders worked through a security scenario at J. Percy Priest Dam today to open communication channels and facilitate awareness of possible threats to infrastructure operated and maintained by the U.S. Army Corps of Engineers Nashville District.
  • NR 19-015: Nashville District dams saved $1.72 billion in flood damage

    NASHVILLE, Tenn. (March 5, 2019) – The 10 dams operated by the Corps of Engineers in the Cumberland River Basin performed as designed during the wettest February on record, saving an estimated $1.72 billion in would-be flood damage to the region.
  • NR 19-012: Corps turns attention to drawing down storage reservoirs

    NASHVILLE, Tenn. (Feb. 24, 2019) – As rainfall runoff makes its way through the Cumberland River Basin, the U.S. Army Corps of Engineers Nashville District is quickly turning its attention to drawing down its storage reservoirs.
  • NR 19-007: Nashville District managing water releases in Cumberland River Basin

    NASHVILLE, Tenn. (Feb. 21, 2019) – The U.S. Army Corps of Engineers Nashville District continues to monitor stream conditions throughout the Cumberland River Basin and to manage the release of water from its 10 dams as heavy rain continues to impact the region this week.
  • Region recognizes J. Percy Priest project on its 50th birthday

    NASHVILLE, Tenn. (June 29, 2018) – Community leaders and citizens celebrated the 50th Anniversary of J. Percy Priest Dam and Reservoir today, acknowledging the project’s positive impact on the region since President Lyndon B. Johnson dedicated it as a perfect example of the new conservation 50 years ago.
  • NR 18-020: Corps of Engineers invites public to J. Percy Priest Dam’s 50th Anniversary celebration

    NASHVILLE, Tenn. (June 13, 2018) – The U.S. Army Corps of Engineers Nashville District invites the public to attend a ceremony to celebrate the 50th Anniversary of J. Percy Priest Dam and Reservoir 10 a.m. Friday, June 29, 2018. The dam will serve as the backdrop for this historical occasion.
  • NR 18-007: Public invited for J. Percy Priest Dam Powerhouse tour on Stones River

    NASHVILLE, Tenn. (March 22, 2018) – The U.S. Army Corps of Engineers Nashville District at J. Percy Priest Dam & Reservoir is offering two free guided tours of the J. Percy Priest Hydroelectric Dam in celebration of the reservoir's 50th anniversary. Dam tours will be held Friday, June 29, 2018 at 11:45 a.m. and 1 p.m. There is a limit of 25 people per tour.
  • NR 17-39: Road closure scheduled across J. Percy Priest Dam

    (PLEASE NOTE CORRECTION TO DATES OF CLOSURE) NASHVILLE, Tenn. (Oct. 26, 2017) — The U.S. Army Corps of Engineers Nashville District announces Bell Road will be closed daily from 8 a.m. to 3 p.m. Monday through Friday from Nov. 6 through Nov. 17, 2017 where the roadway crosses J. Percy Priest Dam. The closure is required for scheduled operational maintenance on the dam.
  • Nashville District prepares for remnants of Hurricane Harvey

    NASHVILLE, TENN. (Aug. 31, 2017) – The U.S. Army Corps of Engineers Nashville District Water Management Center is preparing for heavy rainfall in areas of the lower Cumberland River Basin from remnants of Hurricane Harvey, and is managing the release of water from dams throughout the Cumberland Basin to reduce flood risk.
  • NR 17-027: Nashville District prepares for remnants of Hurricane Harvey

    NASHVILLE, TENN. (Aug. 31, 2017) – The U.S. Army Corps of Engineers Nashville District Water Management Center is preparing for heavy rainfall in areas of the lower Cumberland River Basin from remnants of Hurricane Harvey, and is managing the release of water from dams throughout the Cumberland Basin to reduce flood risk.