Results:
Author: Tyler Stalker
Clear
  • Corps of Engineers completes Yolo Bypass levee repairs

    USACE began necessary repairs on 2,000 feet of levee in July 2011 to restore its full flood risk reduction capability. After excavating the landside of the levee, construction crews installed a gravel drainage system in the toe, or bottom, of the levee, replacing the compacted soil before rebuilding the levee.