A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More
park ranger in foreground looks out toward blue lake from the shore.
Army Corps of Engineers waives fees and invites volunteers to participate in National Public Lands Day, Sept. 27
Sep. 15, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today that it will waive day use fees normally charged at boat launch ramps and swimming beaches at its...
Read More
A group of men and women pose for a picture in a conference room.
USACE Value Engineering Team Recognized on Global Stage
Sep. 09, 2025 | 
News
For the first time in its 250-year history, the U.S. Army Corps of Engineers earned a Top 20 finish for its innovative approach to project delivery...
Read More

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,814
Follow Us

News Releases

Results:
Tag: McMurdo Station (Antarctica)
Clear
  • PUBLICATION NOTICE: Concept for Artificial Freezing of Sea Ice at Winter Quarters Bay, Antarctica

    ABSTRACT:  McMurdo Station serves as a major research and logistics hub for the United States Antarctic Program (USAP). Adjacent to the Station is Winter Quarters Bay (WQB), where vessels dock to unload cargo and fuel. The ice pier at McMurdo is essential for this annual vessel resupply but represents a failure potential, occasionally breaking up during or immediately after vessel operations. This study aimed to determine the feasibility of using thermopiles, a passive cooling technology, to artificially freeze seawater to “grow” the existing WQB bottomfast-ice edge so that ships can dock directly against it. Finite element simulations using modeling-parameter assumptions indicate that each row of thermopiles can grow a frozen wall to a depth of 9 m in about a month if installed on 1 July with an initial sea-ice thickness of 1 m and a thermopile spacing of 1.5 m. For our simulation scenarios, we approximate that it would take 255 to 820 days to complete a 40 m by 140 m wedge of bottomfast ice. The estimated cost ranges from about $600,000 to $1,600,000. These results serve as a preliminary feasibility study of successfully using thermopiles for generating a direct docking bottomfast-ice wharf at McMurdo.

Mississippi Valley Division