U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

Results:
Tag: Covington
Clear
  • March

    District conducting controlled flood release at Gathright Da

    COVINGTON, Va. – Operators at Gathright Dam began a controlled flood storage release Tuesday due to increased rainfall. Beginning at 9 a.m., operators at the dam gradually increased the release rate from 1,200 cubic feet per second (cfs) to 5,000 cfs over a three-hour period. This change in release rates will increase river stages at the dam about 2.7 feet and approximately 2.5 feet in Covington over the next 6 to 10 hours.
  • October

    Gathright Dam’s third pulse release set for October 14

    COVINGTON, Va. – Gathright Dam operators are scheduled to carry out the year’s third water-pulse
  • September

    Gathright Dam pulse release canceled as river conditions ‘favorable’

    NORFOLK, Va. – Norfolk District, U.S. Army Corps of Engineers officials have canceled Wednesday’s scheduled pulse release at Gathright Dam in the Alleghany Highlands of Virginia near Covington.
  • Norfolk District cancels Gathright Dam pulse release

    NORFOLK, Va. – Norfolk District, U.S. Army Corps of Engineers officials have canceled Wednesday’s scheduled pulse release at Gathright Dam in the Alleghany Highlands of Virginia near Covington.

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,765
Follow Us

Mississippi Valley Division