U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

Results:
Tag: Pipestem Dam
Clear
    • No Items.

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,765
Follow Us

News Releases

Results:
Tag: Pipestem Dam
Clear
  • Jamestown Reservoir releases increasing after rains

    Reservoir releases from Jamestown Dam (North Dakota) are being increased to 350 cubic feet per second.
  • Pipestem Reservoir reaches expected summer release

    Reservoir releases are being increased from Pipestem Dam to its expected summer release. The current pool elevation at Pipestem Dam is 1478.5 feet, almost 51% into its flood pool. Lake levels peaked this year on June 3 at 1479.4 feet, almost 53% into its flood pool. Today, releases are being increased from 450 cubic feet per second to 550 cfs. This release is expected to stay constant for the remainder of the summer. The target date for flood control evacuation at Pipestem Dam is Sept. 1.
  • Pipestem Reservoir reaches expected summer release

    Reservoir releases are being increased from Pipestem Dam to its expected summer release. The current pool elevation at Pipestem Dam is 1478.5 feet, almost 51% into its flood pool. Lake levels peaked this year on June 3 at 1479.4 feet, almost 53% into its flood pool. Today, releases are being increased from 450 cubic feet per second to 550 cfs. This release is expected to stay constant for the remainder of the summer. The target date for flood control evacuation at Pipestem Dam is Sept. 1.
  • Corp starts spring releases from Jamestown, Pipestem reservoirs

    The U.S. Army Corps of Engineers, Omaha District, is increasing reservoir releases at Jamestown and Pipestem dams in North Dakota to begin evacuating spring snow melt runoff.

Mississippi Valley Division