Results:
Tag: Flood prevention
Clear
  • Garrison Project hosts industry day for largest dam safety modification project in USACE history

    Contractors from 10 construction and engineering firms attended an industry day Oct. 11 at the Garrison Dam located between Riverdale and Pick City, North Dakota. The industry day was part of early planning efforts for a U.S. Army Corps of Engineers multi-year project considered to be the largest dam safety modification project in USACE history.
  • Memphis Revetment Season in full swing

    The Memphis District Revetment season officially began this year on June 11, with District Commander Col. Zachary Miller hosting a kickoff meeting at the Ensley Engineer Yard to get things started. “Protecting the Mississippi River banks keeps the channel in place, which maintains the necessary depth and alignment that allows the thousands of tows to travel up and down the river year round,” the commander said. “Without this work, the river would shift resulting in new, shallow cutoffs that could not be safely traveled.”
  • USACE working with Zion National Park to keep visitors safe

    Imagine an adventurous day of hiking deep into one of Utah’s rugged slot Canyons. Sure it’s a bit cloudy, but rain isn’t forecast in the area for another two hours. What you don’t know, is that it’s already pouring a couple miles upstream with water levels rising fast. And all that water is headed your way.
  • Power of the pump, no telework

    While many people are at home working in front of a computer, the U.S. Army Corps of Engineers have people out in the field operating equipment and facilities that, at this point in time, cannot be controlled from a workstation at home. The Graham Burke Pumping Plant is one of those “pieces” of equipment that requires people to be on-site for safe operation. Pumping Plant Operator Leaderman William “Billy” Ray and Pumping Plant Operator John “Brady” Foran are two of those valuable employees who are called upon to run one of the Corps’ most valuable facilities.
  • Beavers build dams at Shenango Lake

    Shenango Lake maintenance workers cleared a beaver dam from a road culvert at Golden Run Wildlife Area to prevent flooding, Feb. 3.
  • Corps of Engineers tests Sepulveda Dam crest gates Monday

    On Monday, July 27 between 8 a.m. and 3 p.m., USACE will perform operational testing on the Sepulveda Dam spillway crest gates. The crest gates block off the spillway to provide additional, temporary storage during an extreme storm event.