Results:
Tag: Mississippi River Basin
Clear
  • Corps releases final report on deterring movement of Asian carp into the Great Lakes

    ROCK ISLAND, Illinois. - The U.S. Army Corps of Engineers has released The Great Lakes Mississippi River Interbasin Study – Brandon Road Final Integrated Feasibility Study and Environmental Impact Statement (GLMRIS-Brandon Road Report and EIS). A review period will run November 23 through December 24.
  • Mississippi River Commission gains fresh perspective of Tennessee, Cumberland Rivers

    NASHVILLE, Tenn. (Aug. 14, 2015) – The Mississippi River Commission recently navigated the Tennessee and Cumberland Rivers to gain a fresh perspective for the development of plans to improve the condition of the Mississippi River Basin, foster navigation, promote commerce, and reduce flood risk.
  • NR 15-027: Open house set on board Motor Vessel Mississippi in Chattanooga

    NASHVILLE, Tenn. (July 31, 2015) – The public is invited to an open house on board the Motor Vessel MISSISSIPPI when it is docked at Ross’s Landing in Chattanooga from 4 to 8 p.m. Friday, Aug. 7. The vessel is the U.S. Army Corps of Engineers’ largest diesel towboat and flagship to the Mississippi River Commission, which is inspecting Tennessee Valley Authority and U.S. Army Corps of Engineers Nashville District projects along the Tennessee and Cumberland Rivers as part of the commission’s annual low water inspection trip.