Results:
Tag: civil works
Clear
  • Gathright Dam’s next pulse release set for Wednesday

    COVINGTON, Va. – Gathright Dam operators are scheduled to conduct the year’s fifth water-pulse release from Lake Moomaw on Wednesday. It will take place between 6 a.m. and 1:30 p.m.
  • Army Corps of Engineers promotes water safety this summer season

    Summer is almost here and that means millions of Americans will be planning visits to our nation’s lakes and rivers. As the steward of many of these public waters, the U.S. Army Corps of Engineers (USACE) reminds visitors to be aware of the importance of practicing safe, sensible and thoughtful activities in and around the water.
  • Army Corps of Engineers waives fees on National Public Lands Day, Sept. 28

    The U.S. Army Corps of Engineers (USACE) announced today that it will waive day use fees normally charged at boat launch ramps and swimming beaches at its recreation areas nationwide in recognition of National Public Lands Day on Saturday, Sept. 28.
  • Gathright Dam’s fourth pulse release of 2019 set for Sept. 4

    COVINGTON, Va. – Gathright Dam operators are scheduled to carry out the year’s fourth water-pulse release from Lake Moomaw on Sept. 4. It will take place between 6 a.m. and 1:30 p.m.
  • USACE pushes ahead with Deep Creek Bridge Replacement Project

    Norfolk District, U.S. Army Corps of Engineers has mapped out plans to replace the aging Deep Creek Bridge in Chesapeake, alongside its state and city partners.
  • Gathright Dam’s third pulse release set for Aug. 14

    Gathright Dam operators are scheduled to conduct the year’s third water-pulse release from Lake Moomaw on Aug. 14.
  • Protecting the Texas Coast

    The Coastal Texas Protection and Restoration Feasibility Study is currently the largest civil works feasibility study in USACE and in the United States with plans of coastal protection spanning across 76 miles of Texas coastline. The plan calls for coastal storm resiliency measures to include surge gates, vertical lift gates, ring barrier, height extension of the seawall as well as beach and dune measures. Over the course of the study, over 600 storms were modeled and analyzed by a state-of-the art Coastal Storm Modeling Suite.
  • Norfolk District begins James River dredging

    NORFOLK, Va. – James River Federal Navigation Project engineers are ramping up efforts to minimize shoaling effects and improve safe navigation along Central Virginia’s winding watershed. Norfolk District, U.S. Army Corps of Engineers and Cottrell Contracting Corp. commenced maintenance dredging Sunday in the 7.6-mile Dancing Point-Swann Point channel.
  • Gathright Dam’s second pulse release of 2019 set for Wednesday

    COVINGTON, Va. – Gathright Dam operators are scheduled to carry out the year’s second water-pulse release from Lake Moomaw on Wednesday. It will take place between 6 a.m. and 1:30 p.m.
  • Corps Collaboration Revitalizes Urban Green Space

    After days of heavy rain and storms in the area, the sun shined brightly on the ribbon cutting, or more correctly stated, valve-turning ceremony for the completion of the Sheraden Park Aquatic Ecosystem Restoration Project, June 1.