Results:
Tag: dam
Clear
  • Nashville mayor goes up river to see dam safety project

    Nashville Mayor Karl Dean visited Wolf Creek Dam Aug. 7, 2012 to see the ongoing foundation remediation construction, which is a dam safety project of vital importance to the citizens he represents 270 miles downstream.
  • NR 12-030: Corps offers tours of Old Hickory Navigation Lock

    OLD HICKORY, Tenn. (Aug. 9, 2012) – The U.S. Army Corps of Engineers Nashville District is offering the public free guided tours of the Old Hickory Navigation Lock. These are the first public tours of the lock since visitation was restricted after Sept. 11, 2001.
  • Construction begins with 'first bite' on foundation barrier wall at Center Hill Dam

    The "first bite" of a $106 million drilling project to stabilize the earthen portion of the Center Hill Dam with a barrier wall was taken July 11, 2012 by the U.S. Army Corps of Engineers Nashville District and its contractor, Bauer Foundation Corporation, as the auger of a giant drill rig turned up the first dirt to the cheers of spectators.
  • NR 12-014: Nashville District cautions boaters in low-water conditions

    NASHVILLE, Tenn. (May 23, 2012) – With Memorial Day weekend fast approaching and an anticipated increase in traffic on U.S. Army Corps of Engineers Nashville District lakes, boaters are urged to be cautious in low-water conditions at Lake Barkley, Center Hill and J. Percy Priest Lakes.
  • Commentary: Don’t allow tragedy to drown out fond memories at Corps lakes this summer

    NASHVILLE, Tenn. (May 7, 2012) – With the 2012 recreation season already underway, I want everyone to know that “Water Safety” is extremely important to me and to everyone that serves the public in the Nashville District.
  • Prep students shadow Nashville District engineers

    NASHVILLE, Tenn. (March 9, 2012) – Experiencing the “day in the life” of an engineer, two sophomores from Montgomery Bell Academy participated in a shadow program today with the U.S. Army Corps of Engineers Nashville District Engineering Branch.
  • Scrutinizing Sediment Deposits at Cochiti Lake

    The effectiveness of Cochiti Dam for sediment control has led to a serious issue confronting the reservoir—sediment deposition is reducing reservoir storage capacity and causing significant aggradation upstream within the Rio Grande channel. Monitoring sediment volume, spatial distribution and rate of deposition is of paramount concern to the District. Consequences for the operation and life expectancy of Cochiti Dam and Reservoir are at stake.