• Muddy River FRM project temporary lane closures announced for March 29

     The U.S. Army Corps of Engineers, New England District announced today upcoming temporary lane
  • USACE temporarily closes Canyon Lake’s Overlook Park for maintenance

    Fort Worth District, U.S. Army Corps of Engineers officials at Canyon Lake announced today that Overlook Park will be closed on Monday, March 29, for maintenance.
  • USACE Vicksburg District operates gates of Muddy, Steele Bayou control structures

    The U.S. Army Corps of Engineers (USACE) Vicksburg District opened the gates of the Muddy Bayou Control Structure March 5 and closed the gates of the Steele Bayou Control Structure March 15, located approximately 10 miles north of Vicksburg, Mississippi.
  • ERDC University 2021 selectees announced

    Engineers from four U.S. Army Corps of Engineer (USACE) districts have been selected for the 2021 session of the U.S. Army Engineer Research and Development Center University (ERDC-U). Now in its sixth year, ERDC-U pairs USACE division and district participants with relevant laboratory mentors for six-month research projects.
  • Virtual REM workshop set for April

    Huntsville Center is holding a virtual Resource Efficiency Manager workshop on April 27 –29.
  • Energy savings contract revitalizes airfield

    In 2019 Huntsville Center awarded a fully funded $5.4 million modification to the contract’s task order to improve mission readiness and secure infrastructure by upgrading lighting and replacing decades- old wiring on Fort Knox’s Godman Army Airfield.
  • Corps' Mt. Carmel Campground to Re-Open under New Name and Operation

    Savannah, Ga. – The U.S. Army Corps of Engineers Savannah District at J. Strom Thurmond Project announces that Mt. Carmel Campground in McCormick County, SC has been leased to KWGM, LLC and will re-open to the public as Hester’s Bottoms Campground.
  • Corps will dig dry conditions with finished Kentucky Lock cofferdam

    GRAND RIVERS, Ky. (March 24, 2021) – The cofferdam at the Kentucky Lock Addition Project is finished, a milestone that paves the way for downstream excavation work to prepare the site for construction of the remaining portion of the new lock chamber.
  • Virtual Collaboration Allows Critical Project to Stay on Track

    A current project in Iraq, to bring Imam Ali Air Base up to operational capability, involves extensive refurbishment and renovation to the Air Traffic Control Tower (ATCT) building, includes new ATCT equipment, supporting airfield electrical power and communications infrastructure, backup power improvement, installation of new ILS/DME and TACAN systems; and a potential renovation of the existing airfield lighting system.  Accomplishing this involves extensive coordination among the Iraqi Air Force, the Aerospace Management Systems Division, Air Force Life Cycle Management Center (AFLCMC/HBA) at Hanscom Air Force Base, TAM and Memphis Districts, all while respecting the COIVD restrictions in place.
  • Project Makeover: Tractor Shop Breakroom

    The Memphis District's skilled tradesmen are at it again, demoing and remodeling one building at a time until they've covered every structure in need of a makeover at Ensley Engineer Yard. Recently, a team of mechanics, electricians, carpenters, pipefitters, HVAC technicians, and revetment workers all got together to completely renovate the Tractor Shop’s breakroom, literally from the ground up.