U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

Navigation and Ecosystem Sustainability Program (NESP)

Published March 5, 2020
Updated: March 5, 2020
Project:

Navigation and Ecosystem Sustainability Program (NESP)

In 1986, the Upper Mississippi River System (UMRS) was declared by Congress as “a nationally significant ecosystem and a nationally significant commercial navigation system.” In November 2007, Congress passed the Water Resources Development Act (WRDA 2007) Title VIII authorization for modernizing the navigation system and restoring the environment, which is the first of its kind — a dual-purpose, integrated program to enhance and improve UMRS. This authority, known as Navigation and Ecosystem Sustainability Program (NESP), seeks to provide a safe, reliable, cost effective and environment sustainable waterborne navigation system by implementing switchboats at five locks, constructing mooring cells and seven new 1,200 foot locks. NESP will restore the aquatic and terrestrial habitat to a more natural condition on more than 100,000 acres throughout the system through a wide variety of ecosystem projects.

The collaborative development, design and implementation of NESP has created unprecedented support from diverse groups of citizens and stakeholders concerned with the long-term sustainability of this river system.

In a coordinated effort amongst U.S. Army Corps of Engineers districts: St Paul, Rock Island and St Louis, the fiscal year 2020 work plan funds of $4.5M will support:  

  • The districts to start working toward creating a smarter, safer and more efficient transportation system, which will be able to meet the growing demand for waterborne transportation now and into the future. 
  • Small-scale navigation infrastructure and environmental restoration projects designed with the fiscal year 2020 work plan funds will provide a more reliable waterborne transportation system, which will enhance the Nation’s global export competitiveness, boost the Nation’s economy and provide essential habitat for a diverse group of fish and wildlife.
  • This funding will assist the Corps with starting to design a small portion of the authorized program; however, more must be done to modernize and accelerate the construction of critical waterborne transportation infrastructure. If no additional funds are secured, the waterborne transportation infrastructure will continue to inadequately meet the Nation’s needs and increase risks to communities and impact the Nation’s economic competitiveness.
  • Complete the design for 1‒2 small scale ecosystem projects to ensure new start construction readiness.
  • Reassess the small-scale "shovel ready" and large-scale ecosystem projects.
  • Complete the design for 1‒2 small-scale navigation projects to ensure new start construction readiness.
  • Advance the design of a large-scale navigation project.

For related information:  https://www.mvr.usace.army.mil/Missions/Navigation/NESP


News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,765
Follow Us

News Releases

Navigation and Ecosystem Sustainability Program (NESP)

Published March 5, 2020
Updated: March 5, 2020
Project:

Navigation and Ecosystem Sustainability Program (NESP)

In 1986, the Upper Mississippi River System (UMRS) was declared by Congress as “a nationally significant ecosystem and a nationally significant commercial navigation system.” In November 2007, Congress passed the Water Resources Development Act (WRDA 2007) Title VIII authorization for modernizing the navigation system and restoring the environment, which is the first of its kind — a dual-purpose, integrated program to enhance and improve UMRS. This authority, known as Navigation and Ecosystem Sustainability Program (NESP), seeks to provide a safe, reliable, cost effective and environment sustainable waterborne navigation system by implementing switchboats at five locks, constructing mooring cells and seven new 1,200 foot locks. NESP will restore the aquatic and terrestrial habitat to a more natural condition on more than 100,000 acres throughout the system through a wide variety of ecosystem projects.

The collaborative development, design and implementation of NESP has created unprecedented support from diverse groups of citizens and stakeholders concerned with the long-term sustainability of this river system.

In a coordinated effort amongst U.S. Army Corps of Engineers districts: St Paul, Rock Island and St Louis, the fiscal year 2020 work plan funds of $4.5M will support:  

  • The districts to start working toward creating a smarter, safer and more efficient transportation system, which will be able to meet the growing demand for waterborne transportation now and into the future. 
  • Small-scale navigation infrastructure and environmental restoration projects designed with the fiscal year 2020 work plan funds will provide a more reliable waterborne transportation system, which will enhance the Nation’s global export competitiveness, boost the Nation’s economy and provide essential habitat for a diverse group of fish and wildlife.
  • This funding will assist the Corps with starting to design a small portion of the authorized program; however, more must be done to modernize and accelerate the construction of critical waterborne transportation infrastructure. If no additional funds are secured, the waterborne transportation infrastructure will continue to inadequately meet the Nation’s needs and increase risks to communities and impact the Nation’s economic competitiveness.
  • Complete the design for 1‒2 small scale ecosystem projects to ensure new start construction readiness.
  • Reassess the small-scale "shovel ready" and large-scale ecosystem projects.
  • Complete the design for 1‒2 small-scale navigation projects to ensure new start construction readiness.
  • Advance the design of a large-scale navigation project.

For related information:  https://www.mvr.usace.army.mil/Missions/Navigation/NESP


Mississippi Valley Division