I. Upper Mississippi River and Illinois Waterway System Navigation Study
1. Request for Correction (RFC) submitted by Public Employees for Environmental Responsibility (PEER) RE: Monthly Status Report, July 2003, Upper Mississippi River and Illinois Waterway System Navigation Study (July Status Report), U.S. Army Corps of Engineers, Rock Island District, 7 August 2003.
2. Response by Directorate of Civil Works, U.S. Army Corps of Engineers, 8 March 2004.