Work crews at Barkley Power Plant removed a 270-ton rotor assembly, Aug. 16, 2012 from a crippled hydropower unit damaged 18 months ago by an electrical fire. The heavy lift enables the U.S. Army Corps of Engineers Nashville District to move forward with the generator's rehabilitation.