Results:
Tag: Camp Humphreys
Clear
  • Ribbon-cutting opens railhead

    The railhead at Camp Humphreys was officially opened in a ribbon-cutting ceremony, and a tracked engineer recovery vehicle was the first vehicle to roll off the train and onto the railhead on Feb. 17, 2016.