Results:
Tag: construction
Clear
  • USACE awards $40.9 million construction contract for Pocket-area levee improvements

    The U.S. Army Corps of Engineers Sacramento District awarded a $40.9 million construction contract on December 22, 2021, to Maloney Odin Joint Venture of Novato, for 2 miles of levee improvements along the Sacramento River East Levee in Sacramento’s Pocket neighborhood. Construction in 2022 will entail installation of a seepage cutoff wall from Surfside Way at the northern end of down to Sump 132 at the Pocket Canal on the southern end.
  • Louisville District constructing one-of-a-kind multi-use helicopter training facility at Fort Campbell, Kentucky

    The U.S. Army Corps of Engineers is building a $5 million Multi-use Helicopter Training facility to replace the current Special Helicopter Operations Complex training facility at Fort Campbell, Kentucky. This one-of-a-kind facility consists of a deck landing trainer designed to replicate a Destroyer Designated Guided DDG-103 class ship, nicknamed the “U.S.S. Truxton” and will include an attached six-story structure. The landing pad will incorporate the same lighting with a similar aircraft storage configuration as on board the DDG ship.
  • USACE joins DTRA for groundbreaking ceremony on new administrative building

    The U.S. Army Corps of Engineers, Albuquerque District joined the Defense Threat Reduction Agency (DTRA) and Hensel Phelps Construction for a groundbreaking ceremony to mark the beginning of construction on a much-needed administrative building, Dec. 9, 2021.
  • Fielding event marks end of radar construction by Army engineers in Alaska

    At a military installation tucked along a remote stretch of two-lane highway in Interior Alaska, officials recently celebrated the achievement of a major milestone with a fielding event for a newly constructed long range-discrimination radar on Dec. 6.
  • Fielding event marks end of radar construction by Army engineers in Alaska

    At a military installation tucked along a remote stretch of two-lane highway in Interior Alaska, officials recently celebrated the achievement of a major milestone with a fielding event for a newly constructed long range discrimination radar on Dec. 6.
  • FED project OS031 complete

    USAG HUMPHREYS, Republic of Korea – The U.S. Army Corps of Engineers Far East District commemorated the completion of project CY13 ROKFC IN-KIND Bulk Fuel Storage Tanks and Pumps (OS031), with an Acceptance Release Letter (ARL) ceremony in Pyeongtaek, Republic of Korea, Dec. 7.
  • Final ribbon-cuttings close out two-day celebration blitz

    To close out the two-day sprint across five states, the Memphis District held two final ribbon-cutting ceremonies on Nov. 18, 2021. Both events celebrated construction projects completed in Arkansas and Missouri.
  • Army Corps Completes JBLM Airfield Runway Repairs Ahead of Schedule

    The construction of a single-span concrete arch at Joint Base Lewis-McChord Airfield, Tacoma, Washington, was completed ahead of schedule in February 2021. The reinforced concrete structure can withstand a 100-year stormflow compared to the 1950s design that could withstand a 50-year stormflow, and replaces two steel pipe culverts that began eroding and thinning out, causing major structural issues and debris blockages to the runway and the Clover Creek stream that ran beneath it.
  • Army engineers promote sustainable construction practices on Last Frontier

    Each year, the U.S. Army Corps of Engineers – Alaska District constructs projects for the military valued in the millions of dollars to support readiness, training and quality-of-life initiatives for service members in the Far North. For each of these endeavors, the agency works to meet sustainability goals by ensuring the construction practices and new facilities are as energy efficient as possible.
  • Sam Rayburn Lake Office Announces Recreation Area Winter Maintenance

    Fort Worth District, U.S. Army Corps of Engineers officials today at Sam Rayburn Reservoir announce over the next few winter months work will be accomplished repairing and rebuilding infrastructure to select USACE boat ramps and park entrances.