Results:
Tag: construction
Clear
  • Corps lowers impact to fish spawning near Soo Locks

    SAULT STE. MARIE, Mich. (March 5, 2021) - U.S. Army Corps of Engineers (USACE) officials will use dry blasting during New Lock at the Soo construction to avoid or drastically minimize impacts to fish larvae and adult fish spawning near the Soo Locks. The Soo Locks on the St. Marys River allow vessels to navigate the 21 ft elevation change between Lake Superior and the lower Great Lakes. A new Poe-sized lock being built will provide necessary redundancy in the Great Lakes Navigation System’s critical infrastructure. To build the New Lock, deepening the channel on the upstream side (west) of the Poe lock is necessary. Dredging is scheduled to occur in 2021-2022.
  • Brookville Dam temporarily closed to public access due to construction activities

    Portions of the dam recreational area at Brookville Lake, Brookville, Indiana, are temporarily closed to public access while contractors are performing some improvements. To ensure public safety during upcoming construction activities, some public access points will be temporarily closed effective today, March 3, 2021. These intermittent closures will affect vehicular and pedestrian traffic on top of the dam as well as entry points to the Adena Trace hiking trail.
  • 21-007 Maintenance building upgrades to result in parking lot closure at Mill Creek

    Walla Walla, WA -- The U.S. Army Corps of Engineers’ Walla Walla District (Corps) will be trenching a septic line for the new maintenance building near the Mill Creek office beginning tomorrow, March 3. This work will result in the closure of the parking lot and road to the Mill Creek Office, March 3 and 4.
  • CANCELLED: Corps virtual open house for small businesses interested in federal contracts

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, has cancelled the virtual open house for small businesses interested in federal contracts that was scheduled for April 27.
  • Corps to host virtual Fargo-Moorhead industry day for perspective contractors

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, will host a virtual Fargo, N.D. / Moorhead, Minn., industry day March 9, starting at 8:30am.
  • Chief of engineers visits Chickamauga Lock Replacement Project

    CHATTANOOGA, Tenn. (Feb. 3, 2021) – The 55th chief of engineers visited the Chickamauga Lock Replacement Project on the Tennessee River today to meet with project managers and engineers and gain a better understanding of ongoing construction of a new lock chamber.
  • Graham Burke Pumping Station back online

    Congratulations to the Memphis District team responsible for getting the Graham Burke Pumping Station repaired and back online. To celebrate construction completion, the Memphis District Commander Col. Zachary Miller, district leadership, the Project Delivery Team, and a representative of District Partner White River Levee and Drainage District, other pumping plant employees came together to hold a ribbon cutting ceremony on Jan. 20, 2021.
  • Complete: Scour repairs downstream of St. Francis bridge

    The Memphis District has done it again. The Memphis District Commander, Col. Zachary Miller, district leadership, Project Partner Rob Rash, and Project Delivery Team members all gathered to celebrate, with a ribbon-cutting, the completion of yet another significant project involving riverbank armoring. Along with our longtime partner, the St. Francis Levee District of Arkansas, represented by Rob Rash, the Memphis District awarded a contract to A Rock Construction Co., Inc., in the amount of $2,786,197, to remove debris, reshape the channel, and armor the bank with more than 27,000 tons of stone along the CR736 Bridge over the St. Francis River in St. Francis County, Arkansas.
  • Corps awards contract for Sunny Isles Beach renourishment

    The U.S. Army Corps of Engineers, Jacksonville District awarded a contract on Jan 26 to Eastman Aggregate Enterprises, LLC of Lake Worth, Florida, for $14,040,069.05, for the Sunny Isles Beach shoreline renourishment project, part of the Miami-Dade County Beach Erosion Control and Hurricane Protection Project.
  • USACE awards $29.5 million construction contract for Sacramento River levee improvements

    The U.S. Army Corps of Engineers Sacramento District awarded a $29.5 million construction contract on January 15 to Nordic Industries Inc. of Olivehurst, for 1.8 miles of levee improvements at four sites along the Sacramento River East Levee. Construction in 2021 will entail installation of seepage cutoff walls on both sides of Business 80/Highway 50 just upstream of Miller Park, on the south side of the little pocket, and on the north side of the big pocket.