Results:
Tag: Caney Fork River
Clear
  • NR 20-030: Video highlights water management in Cumberland River Basin

    NASHVILLE, Tenn. (Dec. 10, 2020) – The public is invited to watch a newly released video that highlights how water is managed in the Cumberland River Basin in support of flood risk management, commercial navigation, hydropower production, water supply, environmental stewardship, and recreational opportunities.
  • Center Hill Recreation Area opens today

    LANCASTER, Tenn. (May 8, 2020) — The U.S. Army Corps of Engineers Nashville District announces that Center Hill Recreation Area, located adjacent to Center Hill Dam, is once again opening for public use beginning Friday, May 8, 2020.  Center Hill Recreation Area has been closed since 2008 as a result of construction activities related to the Center Hill Dam Rehabilitation Project.
  • NR 20-011: Center Hill Recreation Area opens today

    LANCASTER, Tenn. (May 8, 2020) — The U.S. Army Corps of Engineers Nashville District announces that Center Hill Recreation Area, located adjacent to Center Hill Dam, is once again opening for public use beginning Friday, May 8, 2020. Center Hill Recreation Area has been closed since 2008 as a result of construction activities related to the Center Hill Dam Rehabilitation Project.
  • NR 20-004: Center Hill Lake levels rising for 2020 recreation season

    NASHVILLE, Tenn. (Feb. 24, 2020) – The U.S. Army Corps of Engineers Nashville District has received approval to return Center Hill Lake to normal operations, which means that lake levels will be on the rise for the upcoming recreation season.
  • NR 19-051: State highway over Center Hill Dam closing for maintenance

    NASHVILLE, Tenn. (Dec. 12, 2019) – The U.S. Army Corps of Engineers Nashville District announces that the section of State Highway 141/96 that crosses over Center Hill Dam in Lancaster, Tenn., is closing to all traffic 8 a.m. to 4 p.m. Dec. 16-19, 2019 while workers conduct maintenance.
  • Concrete placement rolling along at Center Hill’s auxiliary saddle dam

    LANCASTER, Tenn. (April 18, 2019) – The U.S. Army Corps of Engineers recently began placing “roller-compacted concrete” to build a reinforcing berm downstream of Center Hill’s auxiliary dam. This construction is the final major risk-reduction contract in the ongoing Center Hill Dam Safety Rehabilitation Project.
  • NR 19-017: Recreation facilities receive damage assessments as waters recede

    NASHVILLE, Tenn. (March 14, 2019) – The U.S. Army Corps of Engineers Nashville District is assessing damage to recreation facilities at its 10 lakes in the Cumberland River Basin as high waters begin to recede.
  • NR 19-015: Nashville District dams saved $1.72 billion in flood damage

    NASHVILLE, Tenn. (March 5, 2019) – The 10 dams operated by the Corps of Engineers in the Cumberland River Basin performed as designed during the wettest February on record, saving an estimated $1.72 billion in would-be flood damage to the region.
  • NR 19-012: Corps turns attention to drawing down storage reservoirs

    NASHVILLE, Tenn. (Feb. 24, 2019) – As rainfall runoff makes its way through the Cumberland River Basin, the U.S. Army Corps of Engineers Nashville District is quickly turning its attention to drawing down its storage reservoirs.
  • Next construction phase gets rolling at Center Hill’s auxiliary dam

    SILVER POINT, Tenn. (Nov. 30, 2018) – The U.S. Army Corps of Engineers Nashville District and contractor Thalle Construction Company are moving towards the conclusion of the Center Hill Dam Safety Rehabilitation Project.