Results:
Tag: Jackson River
Clear
  • Gathright Dam pulse release schedule for Wednesday

    Operators at Gathright Dam near Covington, Virginia will conduct a pulse release Wednesday.
  • After heavy rainfall, Gathright Dam begins controlled flood release

    The Norfolk District, U.S. Army Corps of Engineers will began a controlled flood release at Gathright Dam near Covington, Virginia today.
  • Officials announce Gathright Dam pulse release dates

    The Norfolk District, U.S. Army Corps of Engineers will deviate from Gathright Dam's existing water control plan in order to conduct five pulse releases near Covington, Virginia from July through October 2016.
  • Gathright Dam to halt outflow as contractors perform routine inspection

    The Norfolk District, U.S. Army Corps of Engineers has scheduled a routine inspection at Gathright Dam from Feb. 22 through March 4, 2016.
  • Final Gathright Dam pulse release of 2015 scheduled for Wednesday

    Operators at Gathright Dam near Covington, Virginia will conduct the final pulse release of the year Wednesday. The pulse, conducted by the Norfolk District, U.S. Army Corps of Engineers, will begin at approximately 6 a.m. and end at 1:30 p.m. and will increase levels 3 to 4.5 feet in the Jackson River.
  • Gathright Dam pulse release underway

    At 6 a.m. today, operators at Gathright Dam near Covington, Virginia began conducting a pulse release. The pulse will gradually increase and peak at 3,500 cubic feet per second by 9 a.m. The maximum surge will last two hours, begin to gradually decrease at 11 a.m., and return to 240 cfs by 1:30 p.m.
  • Gathright Dam pulse release scheduled for Wednesday, Sept. 23

    Operators at Gathright Dam near Covington, Virginia will conduct a pulse release Wednesday.
  • Gathright Dam pulse release scheduled for Sept. 2

    Operators at Gathright Dam near Covington, Virginia will conduct a pulse release Wednesday. The pulses will increase levels 3 to 4.5 feet in the Jackson River, and experts advise people who use the river to be aware of the river fluctuations caused by the pulses.
  • Gathright Dam officials cancel pulse release

    Officials at the Norfolk District, U.S. Army Corps of Engineers have canceled Wednesday's pulse release at Gathright Dam. The Norfolk District, in cooperation with the Virginia Department of Environmental Quality and the Virginia Department of Game and Inland Fisheries, determined that recent rainfall eliminated the need for the second planned pulse release of the year.
  • Controlled flood release ends at Gathright Dam

    Gathright Dam near Covington, Virginia will end its controlled flood storage release today. Beginning this morning at 9 a.m., operators at the dam will begin to reduce the release, which is currently at 1,530 cubic feet per second, to 600 cubic feet per second by 11 a.m.