Results:
Tag: Prado Basin
Clear
  • VIDEO Prado Basin Ecosystem Restoration, Chief's Report

    On April 22, Earth Day, Lt. Gen. Scott Spellmon, the 55th Chief of Engineers, signed a Chief’s Report, which recommends a multi-year, multi section plan to tackle loss and/or degradation of aquatic, riparian woodland and floodplain habitats along the Santa Ana River due to numerous issue the waterway has experienced since the 1940s.
  • Chief of Engineers signs report recommending ecosystem restoration in Prado Basin

    The U.S. Army Corps of Engineers’ top general signed a report April 22 – on Earth Day – recommending a plan to restore more than 600 acres of valuable riparian habitat within the largest riparian forest in Southern California. Lt. Gen. Scott Spellmon, the Corps’ commanding general and 55th U.S. Army chief of engineers, signed the Chief of Engineer’s Report for the Prado Basin Ecosystem Restoration and Water Conservation Feasibility Study at the Corps’ headquarters in Washington, D.C. The project is headed by the Corps’ Los Angeles District, in partnership with the Orange County Water District.