Results:
Tag: Nashville District
Clear
  • Bateman speaks at Nashville District retiree luncheon

    Nashville, Tenn. (March 20, 2013) — Vanessa Bateman, chief of the U.S. Army Corps of Engineers Nashville District Geology Section, briefed Corps retirees on the Wolf Creek Dam Foundation Rehabilitation Project and the Wolf Creek Information Management System March 20, 2013 at their Spring Retiree Luncheon at the Piccadilly Cafeteria located at 874 Murfreesboro Pike.
  • Forum focuses on woman owned business

    NASHVILLE, Tenn. (March 13, 2013) – More than 250 business owners and managers received extensive information about woman owned business opportunities within the federal, state and local procurement systems during the 2nd Annual Small Business Training Forum today at the Tennessee State University Avon Williams Campus.
  • Kentucky Fish and Wildlife Officers earn Water Safety Award

    MONTECELLO, Ky. (March 13, 2013) – U.S. Army Corps of Engineers, Nashville District representatives presented Officers from the Kentucky Department of Fish and Wildlife Resource with the Great Lakes and Ohio Division 2012 Water Safety Award.
  • Lake Cumberland park rangers recognized for decades of work

    SOMERSET, Ky. (March 13, 2013) – U.S. Army Corps of Engineers Nashville District personnel at Lake Cumberland unveiled an honorary display wall today to commemorate the service of park rangers during a ceremony at the Lake Cumberland Visitor’s Center.
  • Nashville District deputy commander promoted to lieutenant colonel

    Lt. Col. James A. DeLapp, U.S. Army Corps of Engineers Nashville District commander, officiated and promoted Maj. Patrick Dagon to lieutenant colonel here at a ceremony attended by his family and district employees at the headquarters building.
  • NR 13-008: Corps completes barrier wall at Wolf Creek Dam

    NASHVILLE, Tenn. (March 6, 2013) – The U.S. Army Corps of Engineers Nashville District poured concrete for the last pile of the barrier wall today, which completes the last and most critical component of the dam safety project required to mitigate seepage through the karst geology deep in the foundation of Wolf Creek Dam’s embankment. It is the last of 1,197 piles that are approximately four feet in diameter and extend up to 275 feet into bedrock below the foundation of the embankment. Altogether they interlock to form the barrier wall.
  • Nashville District completes Wolf Creek Dam barrier wall

    JAMESTOWN, Ky. (March 6, 2013) – Construction workers placed concrete for the last pile today, which completes the underground barrier wall and paves the way for raising the Lake Cumberland pool level. It is the last of 1,197 piles that are approximately four feet in diameter and extend 275 feet from near the top of the dam into bedrock below the foundation of the 4,000-foot long embankment of Wolf Creek Dam.
  • Dive team inspects Pickwick Lock ahead of dewatering

    COUNCE, Tenn. (March 5, 2013) – Divers and support personnel are doing a thorough underwater inspection of Pickwick Lock this week ahead of scheduled maintenance. The team is looking for signs of wear and tear and mapping its findings as the U.S. Army Corps of Engineers Nashville District prepares to empty water from the lock later this year.
  • Students shadow district personnel for a day of engineering

    NASHVILLE, Tenn. (March 1, 2013) – Two local high school sophomores shadowed a number of very experienced engineers today at the U.S. Army Corps of Engineers Nashville District to learn more about the jobs and educational requirements of the career field.
  • Leadership Development Program Tier 3 class visits Nashville District Feb. 27-28

    Nashville, Tenn., (Feb. 28, 2013)—Ten members of the 2012-2013 Leadership Development Program Tier 3 Class of the Great Lakes and Ohio River Division were welcomed to Nashville District Feb. 27, 2013 and briefed by Lt. Col. James A. DeLapp, district commander and his senior leaders.