Results:
Tag: survey
Clear
  • Workplace survey results prompt nearly 40 recommendations

    The results of two employee surveys at the U.S. Army Engineering and Support Center pointed out areas where Huntsville Center excels and also identified nearly 40 recommendations for improvements here.
  • Officials to delay opening Dismal Swamp Canal until end of October

    Officials at the Norfolk District, U.S. Army Corps of Engineers have delayed reopening the Dismal Swamp Canal until late October. “Recent weather events have delayed progress, and the latest condition survey of Turners Cut showed that additional dredging was needed,” said Keith Lockwood, Norfolk District Operations Branch chief.
  • Corps of Engineers plans brief outflow reduction at Baldhill Dam

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, is reducing outflows into the Sheyenne River at Baldhill Dam, located northwest of Valley City, North Dakota, to approximately 100 cubic feet per second, or cfs, beginning Monday, July 17.
  • Army Corps, Susquehanna River Basin Commission partner to provide data to FEMA to revise flood maps in Pennsylvania

    March 9, 2017, marked the Susquehanna River Basin Commission’s first day in the field on Swatara Creek, a tributary of the Susquehanna River in east central Pennsylvania, for a project in collaboration with the U.S. Army Corps of Engineers, Baltimore District, to provide information to the Federal Emergency Management Agency Region III that will help FEMA update their flood risk maps.
  • Real-time feedback goal of new customer comment card program

    Customer satisfaction is one of the key indicators of the health and success of Huntsville Center, which operates as a nearly 100 percent cost-reimbursable organization. Getting feedback from customers more than once a year to better assess their satisfaction is the goal of a new customer comment card program launched at the end of April.
  • Geotech visits East Branch

    Tom Brown and Joe Premozic from the Geotechnical Engineering Section traveled to the U.S. Army Corps
  • New survey vessel brings enhanced capability to support district missions

    The Florida II is a 62-foot aluminum hydrofoil-assisted catamaran hydrographic survey vessel that was built to Corps specifications by All American Marine and commissioned in February 2013. The
  • U.S. Army Corps of Engineers to conduct visitor surveys at recreation areas beginning this spring

    WASHINGTON, D.C. – The U.S. Army Corps of Engineers (USACE) announced today that it will conduct visitor surveys this spring and summer at more than 30 of its lake sites nationwide. Beginning in late March and continuing through September 2013, visitors exiting USACE-managed recreation facilities will be asked about their length of stay and overall experience. Participation in the survey is voluntary.
  • USACE Galveston District awards task order contract for light detection and ranging survey data collection

    GALVESTON, Texas (Jan. 18, 2013) – The U.S. Army Corps of Engineers, Galveston District, awarded a task order contract in the amount of $267,807.37 to AECOM Technical Services for Light Detection and Ranging (LIDAR) survey data collection at 32 dredging placement areas at various locations along the Texas portion of the Gulf Intracoastal Waterway (GIWW).
  • Survey crews to start work on Tangier Jetty

    Physical work on the feasibility phase of the Tangier Jetty program is set to begin this week, weather dependant. A Norfolk District survey crew will operate in the water where the jetty is to be built at the federal navigation channel entranceway on the western side of the island.