Results:
Tag: EIS
Clear
  • Corps of Engineers publishes the Line 5 Tunnel Project Draft Environmental Impact Statement

    The U.S. Army Corps of Engineers, Detroit District published the Line 5 Tunnel Project Draft Environmental Impact Statement (DEIS) May 30, 2025. The DEIS is published on the Line 5 Tunnel Project website at: https://www.line5tunneleis.com/draft-eis/.
  • Corps of Engineers releases Line 5 Tunnel Project tentative timeline

    The U.S. Army Corps of Engineers, Detroit District released an updated Line 5 Tunnel Project permit review and Environmental Impact Statement (EIS) timeline May 2, 2025. The Draft EIS is expected to be published in the Federal Register on May 30, 2025. The Detroit District will conduct a 30-day public comment period (May 30 to June 30, 2025) following the release of the Draft EIS. “Public participation is an important part of the National Environmental Policy Act (NEPA) process to ensure a thorough environmental analysis, and an effective, consistent and well-informed decision,” Detroit District Commander Lt. Col. Wallace Bandeff said.
  • Corps of Engineers releases Final EIS for Willamette Valley dams

    The U.S. Army Corps of Engineers (USACE), Portland District has released the Willamette Valley System Operations and Maintenance Final Environmental Impact Statement (FEIS).
  • Corps extends public comment period for proposed Willamette Valley System 30-year plan

    The U.S. Army Corps of Engineers’ Portland District (Corps) has extended the deadline from Jan. 19 to Feb. 23 for public feedback on its proposed 30-year plan for the operation and maintenance of 13 dams and reservoirs across the Willamette River Basin.
  • U.S. Army Corps of Engineers Issues Section 404 Permit Authorizing Fill Discharge Associated with Northern Colorado Water Conservancy District’s Northern Integrated Supply Project

    Today, the US Army Corps of Engineers signed a record of decision for the Northern Colorado Water Conservancy District’s request to discharge fill material into 33.6 acres of waters of the United States. The fill discharge will facilitate construction activities associated with their Northern Integrated Supply Project (NISP).
  • Corps seeking public comment on proposed 30-year plan for Willamette Valley System

    The U.S. Army Corps of Engineers’ Portland District (Corps) is asking for public feedback now through Jan. 19 on its proposed 30-year plan for the operation and maintenance of its system of 13 dams and reservoirs across the Willamette River Basin.
  • Corps of Engineers selects Enbridge Line 5 tunnel project EIS contractor

    The U.S. Army Corps of Engineers, Detroit District, expects the Environmental Impact Statement (EIS) process for Enbridge Line 5’s tunnel permit application to begin soon following its selection of a contractor to prepare the EIS. The Detroit District, responsible for the tunnel project permit request review, selected Maryland-based Potomac-Hudson Engineering, Inc. as the third-party contractor to prepare the EIS for Enbridge’s proposed Line 5 Tunnel under the Straits of Mackinac. An EIS is a thorough and comprehensive National Environmental Policy Act (NEPA) document the Detroit District will use in making a permit decision.
  • Virtual reality experience shows Willamette Valley environmental progress

    Army engineers and planners continue developing an Environmental Impact Statement (EIS) for the Willamette Valley System (WVS) that will address the continued operations and maintenance of the System in accordance with authorized project purposes; while meeting Endangered Species Act obligations to avoid jeopardizing the continued existence of listed species.
  • Environmental Impact Statement completed for Fort Peck Dam

    The U.S. Army Corps of Engineers, Omaha District has publicly made available the final Environmental Impact Statement (EIS) for test releases from Fort Peck Dam, Montana. The purpose of the EIS is to assess the capacity of test flows from the Fort Peck Dam to promote the growth and survival of the pallid sturgeon, a fish species listed as endangered under the Endangered Species Act of 1973.
  • Comments sought for the Mid-Barataria Sediment Diversion Draft Environmental Impact Statement

    The Coastal Protection and Restoration Authority of Louisiana (CPRA) has applied to the U.S. Army Corps of Engineers for permits and permission to construct, maintain and operate the Mid-Barataria Sediment Diversion project on the west bank of the Mississippi River in Plaquemines Parish.