Results:
Tag: construction
Clear
  • Construction begins with ‘first bite’ on foundation barrier wall at Center Hill Dam

    LANCASTER, Tenn. (July 11, 2012) – The “first bite” of a $106 million drilling project to stabilize the earthen portion of the Center Hill Dam with a barrier wall was taken today by the U.S. Army Corps of Engineers Nashville District and its contractor, Bauer Foundation Corporation, as the auger of a giant drill rig turned up the first dirt to the cheers of spectators.
  • USACE Galveston District employee earns “Hard Hat of the Year”

    GALVESTON, Texas (July 6, 2012) – The U.S. Army Corps of Engineers' Southwestern Division announced
  • New Information Processing Center to consolidate information assets in Europe

    German and American officials broke ground for the next stage in transformation on Wiesbaden's Clay Kaserne June 28, 2012.
  • AFRL’s Space Vehicles Directorate to Get Three Labs

    District employees participated in a groundbreaking ceremony for the Air Force Research Laboratory’s (AFRL) new Space Sensors and Infrared Radiation Effects Laboratory at Kirtland Air Force Base June 7.
  • USACE earns first LEED® certification for US facility in Germany

    The U.S. Army Corps of Engineers Europe District announced June 26, 2012 that it has been awarded the first Leadership in Energy and Environmental Design Silver certification of a U.S. facility in Germany. LEED, established by the U.S. Green Building Council, is an internationally recognized program for the design, construction and operation of high performance green buildings.
  • 12-020: Closure of Cordell Hull Dam Right Bank Tailwater Recreation Area begins July 9

    NASHVILLE, Tenn. (June 22, 2012) – The U.S. Army Corps of Engineers Nashville District announces today that the area below Cordell Hull Dam known as the Right Bank Tailwater Recreation Area is closing July 9 for 150 days during construction work to stabilize the bluff below the dam. The closure area starts at the Turkey Creek Nature Trail parking lot near the Resource Manager’s Office.
  • NR 12-019: State highway over Center Hill Dam restricted to one lane starting July 9

    NASHVILLE, Tenn. (June 22, 2012) – The U.S. Army Corps of Engineers Nashville District announces today Highway 96/141 over Center Hill Dam is being restricted to one lane starting July 9, 2012. The restriction is necessary to enlarge work space on the dam to support the next construction phase of the Center Hill Dam Foundation Remediation Project, installation of the foundation barrier wall. During the two-year duration of the lane restriction, an automated traffic control system will safely manage vehicles across the dam. The maximum wait time is five minutes.
  • NR 12-018: Milestone reached with completion of protective concrete embankment wall at Wolf Creek Dam

    JAMESTOWN, Ky. (June 22, 2012) – The U.S. Army Corps of Engineers Nashville District reached a major milestone here this week at the Wolf Creek Dam Foundation Remediation Project when work crews installed the 433rd and final panel in completing the protective concrete embankment wall. While this wall does not create a water barrier through the dam’s karst limestone foundation, it completes a major stage of construction that is critical to the final stage of construction – the main barrier wall, which is scheduled to be completed by December 2013.
  • U.S. Army Europe names USACE built Mission Command Center

    The new Gen. John Shalikashvili Mission Command Center will be the new home for most of the staff of U.S Army Europe and is located at the newly named Gen. Lucius D. Clay Kaserne, U.S. Army Airfield in Wiesbaden, Germany.
  • Nashville District breaks ground on Cheatham buildings destroyed in May 2010 flood

    ASHLAND CITY, Tenn. (June 18, 2012) – Flood waters in May 2010 submerged the lock operations center and resource manager’s office at Cheatham Dam, forcing personnel to flee. When the water receded, buildings were uninhabitable, and the staff moved into trailers. The U.S. Army Corps of Engineers Nashville District continued the recovery today, breaking ground on the construction of new facilities.