Results:
Tag: Foster Dam
Clear
  • Delayed refill at Corps reservoirs to impact boating, recreation

    Army water managers will delay refilling Cougar and Fall Creek reservoirs and conduct spill operations at Foster Dam as required by the U.S. District Court for the District of Oregon’s Willamette Valley injunction because of recent litigation. The delay at Cougar and Fall Creek will impact the U.S. Army Corps of Engineers’ (Corps) ability to refill the reservoirs to their normal summer levels, which will impact boating and recreation activities.
  • Historic wildfires test Corps’ Willamette Valley projects

    The wildfires that closed in on the Corps’ 13-dam system in the Willamette Valley caused minor damage at four dam sites.
  • Corps closes recreation areas due to Willamette Valley fires

    Due to multiple fires burning throughout the Willamette Valley, the U.S. Army Corps of Engineers, Portland District is closing all of the recreation areas it manages near its dams.
  • Corps drills into Foster Dam during geotechnical investigation

    The U.S. Army Corps of Engineers’ Dam Safety team will conduct a geotechnical investigation at Foster Dam near Sweet Home, Oregon. Drilling should begin on October 22 and it will include boring into the dam’s embankment or rock-fill portion of the dam.
  • Ongoing improvements for fish passage at Foster Dam to close road

    The U.S. Army Corps of Engineers will close the road on top of Foster Dam, Sweet Home, Oregon, to remove a large crane, Dec. 4-29. During this time, Foster Dam Road will be closed to all vehicle and pedestrian traffic. For a time, the Corps used the crane and elevator system, which was innovative for its time, for adult fish collection and passage over Foster Dam; however, the equipment wasn’t fully successful in moving fish above the dam in an efficient manner. Corps biologists concluded there were better options.