.
Inside the new Munitions Disassembly Building. Nearly 70 percent complete, the 10,000 sq. ft. concrete structure, expected to be complete this fall, will have multiple workshops to execute missions.

Download Image: Full Size (1.83 MB)
Tags:
Photo by: . |  VIRIN: 210225-D-A1420-005.JPG