Electrical distribution in Helmand province
AFGHANISTAN — Afghan utility technicians and their U.S. Army counterpart, Staff Sgt. Scott Michael, assemble the air disconnect switch as part of the Sangin Substation upgrade project here, in early March 2012.

Download Image: Full Size (0.34 MB)
Tags: USACE
Photo by: U.S. Army Corps of Engineers |  VIRIN: 120708-A-CE999-005.JPG