Point Pleasant Canal Bulkhead Repairs
Rudy Sorrells, an inspector for Abhe & Svoboda, speaks with Monica Chasten, a project manager for the U.S. Army Corps of Engineers Philadelphia District. Sorrells explains the operation of a desalination station used to produce freshwater for an ultra-high pressure wash of the steel bulkhead along the Point Pleasant Canal.

Download Image: Full Size (0.5 MB)
Tags: bulkhead
Photo by: Tim Boyle |  VIRIN: 130215-A-CE999-012.JPG