Pump Station Generator Install
Hector Paredes, a contractor working for the U.S. Army Corps of Engineers, helps to unspool electircal wire which will be used to connect a temporary emergency power generator a water pump station in Potts Camp, Mississippi. Through its FEMA-assigned mission, USACE is working closely with the Mississippi Emergency Management Agency to identify facilities that are eligible and require temporary emergency power so, if needed, communities can get critical infrastructure such as hospitals, fire stations, warming centers, or other state-run facilities back online as quickly as possible. (U.S. Army photo)

Download Image: Full Size (2.49 MB)
Photo by: Lt. Col Vanessa Bowman |  VIRIN: 260130-A-A1401-1038.JPG