Pump Station Generator Install
Hector Paredes, a contractor working for the U.S. Army Corps of Engineers, moves a temporary emergency power generator into place, so it can be connected to a water pump station in Potts Camp, Mississippi. Through its FEMA-assigned mission, USACE is working closely with the Mississippi Emergency Management Agency to identify facilities that are eligible and require temporary emergency power so, if needed, communities can get critical infrastructure such as hospitals, fire stations, warming centers, or other state-run facilities back online as quickly as possible. (U.S. Army photo)