Dam safety remains top priority admist COVID-19 challenges
Narturi Narciso, engineer in training, U.S. Army Corps of Engineers, Omaha District,enters a conduit at a conduit to inspect the drainage system at Salt Creek Site 2, Olive Creek Dam, Neb., to check for erosion and if the outlet channel in satisfactory condition May 1. This was the first inspection the dam safety program conducted since the COVID-19 pandemic began.

Download Image: Full Size (3.22 MB)
Tags:
Photo by: Nyime Gilchrist |  VIRIN: 200512-A-UX239-383.JPG