Social distancing, the MVM mission
IN THE PHOTO, After placing the flange on the end of the pipe, Fitter Randy Channel grinds the flange welds down flat. Only after this is complete can one flange be bolted to another flange to create a seal. This pipe is for the Vicksburg District’s Dredge Jadwin; one of several projects Ensley Engineer Yard is still working on completing. (USACE photo by Machinist Brandon Almeida)

Download Image: Full Size (0.48 MB)
Tags:
Photo by: Jessica |  VIRIN: 200414-A-CE999-5001.JPG