Critical drainage channels to be maintained
IN THE PHOTOS, aerial photos of ditches representative of 1 and 251. Contracts were awarded to authorize contractors to go in and return a total of 89 miles worth of drainage channels 1 and 251 to their authorized levels of flood protection.

Download Image: Full Size (0.24 MB)
Tags:
Photo by: Jessica Haas |  VIRIN: 200811-A-LD870-1001.JPG