News Stories

Results:
Archive: 2020
Clear
    • No Items.

News Releases

Results:
Archive: 2020
Clear
  • Corps of Engineers issues construction Notice to Proceed for COVID-19 Alternate Care Facility

    Working at the direction of the State of Tennessee and the Federal Emergency Management Agency (FEMA), the Memphis District, U.S. Army Corps of Engineers (USACE) issued a “Notice to Proceed” for the conversion of the former Commercial Appeal building today, located at 495 Union Ave. in Memphis to a COVID-19 Alternate Care Facility (ACF). The overall contract was awarded to AECOM Technical Services of Los Angeles, California.
  • Special Leave Accrual for Service Members

    Under Secretary of Defense for Personnel and Readiness Matthew Donovan signed a department-wide authorization for service members to accrue and retain an additional leave balance of up to 120 days.
  • Corps of Engineers awards a $500k contract for the Next NGA West Integrated Project Office’s janitorial services

    The U.S. Army Corps of Engineers has awarded a multiyear contract to a St. Louis, Missouri company for a total of $491,279.81 to provide the Next NGA West Integrated Project Office’s Janitorial Services. Dala Worldwide Services, a Minority Women-Owned Small Business, will provide janitorial services for the on-site office space throughout the construction of the Next NGA West.
  • Clean-up of former Camp Croft begins with signing of $36.5 million contract

    SAVANNAH, Ga. – Work to clean up former Camp Croft near Spartanburg, South Carolina, will begin soon following the April 1 signing of a contract between the Savannah District, U.S. Army Corps of Engineers, and a joint venture of Weston Solutions, Inc., of Peachtree Corners, Georgia, and Zapata Inc., of Charlotte, North Carolina.
  • Vicksburg District to prepare supplemental environmental impact statement for Yazoo Backwater Pumps Project

    The U.S. Army Corps of Engineers (USACE) Vicksburg District announced April 16 that it will prepare a supplemental environmental impact statement (SEIS) for the Yazoo Area Pump Project in the Yazoo Backwater Area in Mississippi. The public is invited to read the notice of intent for the SEIS, which is published in the Federal Register at the following link: https://www.federalregister.gov/documents/2020/04/16/2020-07966/notice-of-intent-to-prepare-supplemental-environmental-impact-statement-for-the-yazoo-area-pump and to provide comments in accordance with guidance in the notice.  
  • Corps Approves Permit for Lordstown Battery Plant

    U.S. Army Corps of Engineers Pittsburgh District’s Regulatory Division approved and issued a permit under Section 404 of the Clean Water Act (CWA) to General Motors, on behalf of GigaPower LLC, for the construction of a 3-million square-foot battery cell plant in the village of Lordstown, Ohio, April 14.
  • RECOVER Lake Okeechobee Stage Performance Measure approved

    The RECOVER Lake Okeechobee Stage Performance Measure used to evaluate regional scenarios for the Comprehensive Everglades Restoration Plan (CERP) has been approved by the RECOVER (Restoration, Coordination & Verification) Executive Committee.
  • USACE Galveston District publishes intent to prepare Environmental Impact Statement and to hold Public Scoping Meetings for Port Corpus Christi Channel Deepening Project

    GALVESTON, Texas – On April 7, The U. S. Army Corps of Engineers Galveston District published a notice of intent to prepare an Environmental Impact Statement (EIS) for Port Corpus Christi’s proposed Channel Deepening Project. To ensure that all of the issues related to this proposed project are addressed, the Corps will conduct public scoping meetings, at which agencies, organizations, and members of the general public present comments or suggestions with regard to the range of actions, alternatives, and potential impacts to be considered in the EIS.
  • USACE Galveston District publishes Intent to prepare Environmental Impact Statement and to hold Public Scoping Meeting for Dow Chemical Company’s Harris Reservoir Expansion Project

    GALVESTON, Texas –On April 7, The U. S. Army Corps of Engineers Galveston District published a notice of intent to prepare an Environmental Impact Statement (EIS) for Dow Chemical Company’s proposed Harris Reservoir Expansion Project. To ensure that all of the issues related to this proposed project are addressed, the Corps will conduct public scoping meetings, at which agencies, organizations, and members of the general public present comments or suggestions with regard to the range of actions, alternatives, and potential impacts to be considered in the EIS.
  • Corps announces approval of temporary deviation to support Kissimmee River Restoration construction

    The U.S. Army Corps of Engineers Jacksonville District, announces the approval of a planned temporary deviation to the 1981 Lake Kissimmee, Hatchineha and Cypress Interim Regulation Schedule. Major General Diana Holland, Commander of the U.S. Army Corps of Engineers, South Atlantic Division, approved the planned deviation to raise the regulation schedule to facilitate Kissimmee River Restoration Project (KRRP) construction through June 1, 2021.

Mississippi Valley Division

Institute for Water Resources

South Pacific Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,801
Follow Us