U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

Results:
Tag: dredging
Clear
  • January

    Memphis District: 2019 dredged up with a bang

    The Memphis District U.S. Army Corps of Engineers has several missions associated with the Mississippi River. One of the most important is to keep the river channel at a depth that allows the river barge industry to dependably transport goods up and down the river. To deliver on this charge, the Memphis District awarded a contract/task order in the amount of $7,987,200 to the Inland Dredging Company in April of 2019. On Dec. 23, 2019, Inland Dredging Co. completed all work with a total of 1,289,598 cubic yards of sediment dredged from all 10 Memphis District Harbors.
  • December

    Dredging to start in Norfolk Harbor inner channels

    NORFOLK, Va. – The U.S. Army Corps of Engineers and Cottrell Contracting are set to begin dredging the Norfolk Harbor Inner Channel and channel to Newport News on Saturday.
  • November

    Work to resume on Virginia Beach oceanfront project

    Norfolk District, U.S. Army Corps of Engineers and city of Virginia Beach officials said Great Lakes Dredge & Dock LLC, the Virginia Beach Hurricane and Storm Damage Reduction Project’s contractor, intends to mobilize equipment at 68th Street and install submerged pipeline between 60th and 61st streets here this week.
  • January

    Corps leader updates California maritime industry

    Despite a nearly $2 billion budget to maintain the nation's inland waterways and harbors, it simply isn't enough for the U.S. Army Corps of Engineers to meet all the maritime industry’s infrastructure needs, Maj. Gen. Ed Jackson told attendees at the winter meeting of the California Marine Affairs and Navigation Conference held in Marina del Rey, California, Jan. 21.

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,742
Follow Us

News Releases

Results:
Tag: dredging
Clear
  • District awards $15.4 Mil contract to dredge Freeport Lower Stauffer Reach channel

    GALVESTON, Texas – The U.S. Army Corps of Engineers Galveston District awarded a contract in the amount of $15,494,310 to Great Lakes Dredge & Dock, LLC for the first phase of the Freeport Harbor Channel Improvement Project.
  • PUBLICATION NOTICE: Sediment Sorting by Hopper Dredging and Pump-Out Operations: Sampling Methods and Analysis

    Abstract: Hopper dredging operations for beach and nearshore placement typically include periods of overflow, which produces some degree of separation between the size fractions of the dredged sediment. The degree of separation and the controlling factors are presently poorly known. This report focuses on laboratory experiments aimed at determining (1) suitable sampling methods on a dredge, (2) composite sampling techniques to reduce analysis cost, (3) associated sampling intervals to achieve suitable sediment representation of a hopper load, and (4) a hydraulic means of sample splitting. Results showed that no statistical difference exists among the three methods used to sample the hopper weir overflow. The method used to sample deposited hopper sediment identified a bias in the percent fines that resulted from flow sheltering. Further, it was found that composited samples were able to quantify the concentration and percent fines accurately, although an analytical data experiment showed that the accuracy of a composited sample is dependent on the sampling intervals. The accuracy of the fines and concentration from a hydraulic sample splitter was found to be dependent on median grain size, with fine sediment being evenly distributed and coarser sediment increasing the error in concentration and grain size distribution.
  • Statement on barges/676 Bridge

    On the afternoon of August 4th, high flows along the Schuylkill River dislodged the Crane Barge LEHIGH and two associated hopper barges from their moorings. The barges, which were secured between the Spring Garden Bridge and the Vine Street Expressway/676 Bridge, were pushed up against the Vine Street Expressway/676 Bridge. The Pennsylvania Department of Transportation (PennDOT) closed the bridge to traffic in both directions. The U.S. Army Corps of Engineers and its contractor Atlantic Subsea, Inc. assessed the situation and worked on a plan to resolve the matter in coordination with the U.S. Coast Guard and the City of Philadelphia. When water levels subsided on Aug. 6, multiple tugboats were used to move the barges upriver just south of the Martin Luther King Jr. Bridge. The operation was successfully completed around noon on Aug. 6. PennDOT then reopened the bridge to vehicle traffic in the afternoon. The barges were being used as part of a project to dredge portions of the Schuylkill River above the Fairmount Dam.
  • Jacksonville District awards contract to repair Ponce de Leon North Jetty

    JACKSONVILLE, Fla. (Aug. 4, 2020) – The U.S. Army Corps of Engineers Jacksonville District awarded a $7,015,443 contract July 28, 2020, to Kiewit Infrastructure South Co. of Omaha, Neb., for the Ponce De Leon Inlet North Jetty Rehabilitation and Aid to Navigation Replacement Project at Ponce de Leon Inlet in Volusia County, Fla.

Mississippi Valley Division