Wright-Patt hospital renovation improves patient care

Published Aug. 31, 2015
As part of the massive renovation at the state-of-the-art Wright-Patterson Air Force Base Medical Center Complex, there are eight new operating rooms to provide better patient care.

As part of the massive renovation at the state-of-the-art Wright-Patterson Air Force Base Medical Center Complex, there are eight new operating rooms to provide better patient care.

Officials tour one of the new operating rooms that are part of the massive renovation of the Wright-Patterson Air Force Base Medical Center Complex.

Officials tour one of the new operating rooms that are part of the massive renovation of the Wright-Patterson Air Force Base Medical Center Complex.

A formal ribbon-cutting ceremony was held July 31, 2015, to celebrate the completion of the 260,000-square-foot renovation of the Wright-Patterson Air Force Base Medical Center Complex.

A formal ribbon-cutting ceremony was held July 31, 2015, to celebrate the completion of the 260,000-square-foot renovation of the Wright-Patterson Air Force Base Medical Center Complex.

In one of the most logistically-challenging renovations the district has seen, the U.S. Army Corps of Engineers Louisville District helped to complete the monumental task of renovating 260,000 square feet in over 41 departments throughout the Wright-Patterson Air Force Base Medical Center Complex in Ohio—all with minimal impacts to patient care.

“Doing a renovation of a facility is one thing, but doing a renovation of a working hospital and to keep it running is unbelievable,” said Louisville District Commander, Col. Christopher Beck. “It’s an impressive project.”

A ribbon-cutting ceremony was held July 31, 2015, to celebrate the completion of the $99 million dollar multi-phase renovation project that took just over three years to complete. The project involved renovating the 1950s-era hospital to a state-of-the-art health facility with an overhauled Intensive Care Unit, new dining facilities, updated patient rooms, surgery areas, administrative areas and a dental clinic.

The project provided eight operating rooms, including a new hybrid operating room, a laser eye suite that treats 15-20 service members daily, and a plastic surgery center now equipped with Wi-Fi, which helps staff to move patients through the department much easier.
“It’s great to hear from the doctors first-hand about how the renovations have impacted their day-to-day processes and how it’s improving medical care,” said Steve Farkus, Louisville District project manager.

Among all of the new changes, the staff favorite is the new 20,000-square-foot dining facility, which is an upgrade from the small closet-like space that existed previously. The kitchen and dining area are complete with new serving stations, state-of-the-art brick oven pizza maker, and a high-efficiency dish washer capable of handling over 14,000 dishes per hour giving the dining staff the space and tools they need to serve more than 400 patients and staff breakfast and 500 for lunch each day.

“Everything that has happened here is for the benefit of our patients,” said Marc Dowler, chief of Medical Enlisted Force for Air Force Materiel Command. “This is phenomenal. Our patients and staff are all very appreciative of everything we have here.”

The massive renovation called for strong partnering for a successful project. The groups who came together include the Defense Health Agency, 88th Medical Group, 88th Civil Engineer Directorate, Air Force Civil Engineer Center, the USACE Louisville District, the construction contractor Walsh/Butt Joint Venture and the design contractor HKS/WS.

“A project this complex was like assembling a Swiss watch—a large number of moving parts that had to be perfectly synchronized,” said Farkus. “The team took on the challenge and brought this across the finish line. I was honored to be a part of this one.”
Two Soldiers place a medal around a gentlemen's neck.
Individuals, teams recognized in USACE National Awards Ceremony
Jan. 30, 2026 | 
News
The U.S. Army Corps of Engineers (USACE) took time on January 23 to recognize the achievements of many of its outstanding Civilians and Soldiers during a...
Read More
A Deployable Tactical Operations System vehicle pulls out of a parking lot.
USACE Repositions Emergency Power Team to support Mississippi After Storm
Jan. 27, 2026 | 
News
VICKSBURG, Miss – The U.S. Army Corps of Engineers (USACE) is repositioning an Emergency Power Planning and Response Team (PRT) to support the Mississippi...
Read More
Army Corps of Engineers waives day use fees at recreation areas in observance of Presidents Day
Jan. 27, 2026 | 
News Release
The U.S. Army Corps of Engineers today announced that it will waive day use fees at its more than 2,800 USACE-operated recreation areas nationwide in...
Read More
U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More

Mississippi Valley Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
47,715
Follow Us