HQ USACE NEWS RELEASES

A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More
park ranger in foreground looks out toward blue lake from the shore.
Army Corps of Engineers waives fees and invites volunteers to participate in National Public Lands Day, Sept. 27
Sep. 15, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today that it will waive day use fees normally charged at boat launch ramps and swimming beaches at its...
Read More
A group of men and women pose for a picture in a conference room.
USACE Value Engineering Team Recognized on Global Stage
Sep. 09, 2025 | 
News
For the first time in its 250-year history, the U.S. Army Corps of Engineers earned a Top 20 finish for its innovative approach to project delivery...
Read More

HQ USACE News

System 12 Slope Flattening Project contract awarded

Memphis District Public Affairs Office
Published Sept. 30, 2020
System 12 Slope Flattening Project site.

System 12 Slope Flattening Project site.

Congratulations to the System 12 Slope Flattening Project Delivery Team for reaching its Contract Award milestone. The PDT awarded the contract to SYTE Corporation on September 22. The work consists of furnishing all plant, labor and materials for flattening the slope for a 5,700-foot section of levee by placement of compacted fill.

Flattening the levee’s slope provides greater stability. The project will modify the levee’s slope from a 1:4 vertical to horizontal slope to a 1:6 vertical to horizontal slope.  The slope flattening will help reduce erosion caused by storm water runoff thereby extending the life of the levee.

The project is in Marianna, Lee County, Arkansas near the District’s W.G. Huxtable Pumping Station. Our much-appreciated local partner on the project is the St. Francis Levee District of Arkansas.

Members of the PDT that successfully reach this important milestone are Milton Beverly and Zach Cook (project management); Ben Vogel (technical lead); Chip Newman (geotechnical); Jeremy Ruffell and Josh Giannini (civil design);  Ashley Evans (hydraulics and hydrology); Kevin Keller and Jeremy Carpenter (cost engineering); Jennifer Hiltonsmith and Pam Lieb (environmental); Brian Johnson (real estate); Ed Dean, Josh Beam, and Phil Petitt (geospatial/survey); JR Holloway (construction); Ned McNaughton (counsel); Gilbert Chonje and Steven Austin (contracting); Loy Hamilton (Administrative Contracting Officer, Wynne Area Office); and Jonathan Delp (Contracting Officer's Representative, Wynne Area Office).

Congratulations to the entire team for reaching this important project milestone.

 

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,779
Follow Us

News Releases

System 12 Slope Flattening Project contract awarded

Memphis District Public Affairs Office
Published Sept. 30, 2020
System 12 Slope Flattening Project site.

System 12 Slope Flattening Project site.

Congratulations to the System 12 Slope Flattening Project Delivery Team for reaching its Contract Award milestone. The PDT awarded the contract to SYTE Corporation on September 22. The work consists of furnishing all plant, labor and materials for flattening the slope for a 5,700-foot section of levee by placement of compacted fill.

Flattening the levee’s slope provides greater stability. The project will modify the levee’s slope from a 1:4 vertical to horizontal slope to a 1:6 vertical to horizontal slope.  The slope flattening will help reduce erosion caused by storm water runoff thereby extending the life of the levee.

The project is in Marianna, Lee County, Arkansas near the District’s W.G. Huxtable Pumping Station. Our much-appreciated local partner on the project is the St. Francis Levee District of Arkansas.

Members of the PDT that successfully reach this important milestone are Milton Beverly and Zach Cook (project management); Ben Vogel (technical lead); Chip Newman (geotechnical); Jeremy Ruffell and Josh Giannini (civil design);  Ashley Evans (hydraulics and hydrology); Kevin Keller and Jeremy Carpenter (cost engineering); Jennifer Hiltonsmith and Pam Lieb (environmental); Brian Johnson (real estate); Ed Dean, Josh Beam, and Phil Petitt (geospatial/survey); JR Holloway (construction); Ned McNaughton (counsel); Gilbert Chonje and Steven Austin (contracting); Loy Hamilton (Administrative Contracting Officer, Wynne Area Office); and Jonathan Delp (Contracting Officer's Representative, Wynne Area Office).

Congratulations to the entire team for reaching this important project milestone.

 

Mississippi Valley Division