The crane operator begins the installation by setting a steel I-beam into the girder recess notch in the lock wall, starting with the upper or upstream end of the lock.
The crane operator begins the installation by setting a steel I-beam into the girder recess notch in the lock wall, starting with the upper or upstream end of the lock.