USACE exceeds construction placement goals for 6 straight months
AFGHANISTAN — Ayesha Saeed (left), a project engineer at the Herat Resident Office and Baltimore resident, checks on the status of a construction project on Camp Zafar Jan 31, 2012.

Download Image: Full Size (5.19 MB)
Tags: usace
Photo by: Karla Marshall |  VIRIN: 120131-A-CE999-004.JPG