Powerful equipment
The removal of 890 cubic yards of limestone from the navigation channel on the Mississippi River near Thebes, Ill., began Dec. 17, 2012. This is just one phase of the action the Corps is taking to improve the navigation channel for the river industry.

Download Image: Full Size (0.63 MB)
Photo by: USACE |  VIRIN: 121220-A-CE999-015.JPG