Beach renourishment on both sides of Sunny Isles Beach Pier
An eroded area on both sides of the pier will be renourished with a total of 280,000 cubic yards of beach-quality sand will be trucked in from an upland sand mine and placed on the shoreline during the Sunny Isles Beach shoreline renourishment project.

Download Image: Full Size (0.47 MB)
Tags:
Photo by: Mark Bias |  VIRIN: 170407-A-CE999-051.JPG