Tents erected to keep levee work on track through winter
Eight heated tents to condition cohesive material so it can be placed along the levee setback alignment are being used on the L-536 levee system just south of Rock Port, Mo..

Download Image: Full Size (0.3 MB)
Tags:
Photo by: Mike Glasch |  VIRIN: 210115-A-VX653-002.JPG