Critical drainage channels to be maintained
IN THE PHOTO, an aerial photo of a ditch representative of ditches 1 and 251. Contracts were recently awarded to authorize contractors to go in and return a total of 89 miles worth of drainage channels to their authorized levels of flood protection.

Download Image: Full Size (0.5 MB)
Tags:
Photo by: Jessica Haas |  VIRIN: 200811-A-CE999-1007.JPG