Yazoo Seepage Remediation Project
IN THE PHOTO, shows some 2019 flood fight activity, including placement of sandbags as an interim measure to sure-up the integrity of the levee.

Download Image: Full Size (0.12 MB)
Tags:
Photo by: Memphis District |  VIRIN: 200612-A-YI354-0001.JPG