New "mule" on for the tow rail at Lock and Dam 6
The new mule and tow rail is installed at Lock and Dam 6 in Trempealeau, Wis., is used March 17, 2020 to pull the barges out of the lock chamber. This was the first operational use of the new system, which is a vital piece of equipment which assists tows locking through lock and dams when traveling upriver.

Download Image: Full Size (0.97 MB)
Tags:
Photo by: Wade Carr |  VIRIN: 200317-A-A1415-011.JPG