Water-side test and balance set-up
Testing and balancing technician set-up to measure flow rate and temperature of the fluid. This typically occurs during the construction phase of the commissioning process.

Download Image: Full Size (0.08 MB)
Photo by: Patricia Donohue |  VIRIN: 150715-A-CE999-010.JPG