Ice Harbor Advanced Technology Turbine Runner
Burbank, WA. Ice Harbor Dam personnel installed an advanced technology turbine, the first of its kind, on June 8, 2018. This fixed blade turbine runner was designed by U.S. Army Corps of Engineers personnel and Voith for power efficiency and to optimize the safety of fish navigating through Snake River dams.

Download Image: Full Size (1.84 MB)
Tags:
Photo by: Brigida I Sanchez |  VIRIN: 200124-A-AZ123-1002.JPG