Wolf Creek Dam Construction
JAMESTOWN, Ky. — A construction worker operates heavy machinery and removes dirt to prepare for drilling on the work platform at Wolf Creek Dam May 2, 2012. The U.S. Army Corps of Engineers Nashville District is installing a barrier wall into the embankment at the dam to stop seepage in the foundation.

Download Image: Full Size (5.11 MB)
Tags: usace
Photo by: Lee Roberts |  VIRIN: 120501-A-CE999-009.JPG